T: 07961 443407

Specified by Manser Architects for 2 distinct outdoor areas in the new Hilton Hotel opposite Wembley stadium. Each of the items specified were to be made to measure based on our SED range of furniture with upholstery coming from Aqua fabrics and Designers Guild. We were able alter designs to suit as well as the dimensions right up until the last minute before production commenced. We were asked to produce the furniture complete rather than knock down and label all boxes with product name, reference number and location to help with what would be a tight schedule for fit out. The specified fabric was shipped to our factory for cushion manufacture so the furniture and soft furnishings could arrive together. All arrived in UK on time, was unloaded at our warehouse, each item was checked and shipped in three consignments due to access restrictions on site.

This site uses cookies. By continuing your visit, you accept their use as set out in our Cookie Policy. OK